ProjectsProjects

More London Plot 4, London

Market Sector: Commercial Offices
Client: More London Developments
Location: London
Country: England

Project Partners: Management Contractor: Mace Ltd
Architect: Foster & Partners
Engineer: Arup

Project Key Stats: Total Tonnage: 1,540 tonnes

Site Programme: 15 weeks
Completion Date: December 2005


Project Overview:
As part of the More London development on the south bank of the Thames between London and Tower Bridges, Severfield-Reeve carried out connection design, fabrication and erection of 1,540 tonnes of structural steelwork, of which 936 tonnes were FABSECĀ® beams with service holes profiled into the webs.

The steelwork was generally supplied with an off-site intumescent coating to give a fire rating of 60 minutes. Also included within the steelwork package was the supply and fixing of metal decking, edge protection and steel stairs.

This project was a creditable health and safety performance with the Group's "Off-Load Safe" unloading procedure used extensively. (Top Photograph show plots 3 & 4).

FABSEC beams can be used for primary and secondary floor beams and rafters

More London 1.jpg

More London 2.jpg

> Find out about Fabsec's worldwide network
SeverfieldHareSherwin WilliamsTATA Steel