Heron Tower London

 

 

  • Text Hover
Positioned at the heart of London, Heron Tower, also known as 110 Bishopgate, is the first 6* office building in The City.

The project consists of 47 storeys above ground level and 3 storeys below, providing a floor area of 63,000sqm. The building is topped by a 44m mast, making it the UK's tallest building.

Severfield-Reeve Structures was awarded the contract and was responsible for the connection design, fabrication and erection of the 12,000 tonnes of structural steelwork required for this structure.

The 12,000 tonnes included 700 tonnes of Fabsec bespoke plated beams, of which more than 50% were coated with intumescent paint, providing fire protection of between 60 and 120 minutes.

Severfield-Reeve Structures was responsible for the supply and fix of the metal decking, edge protection and stairs for the project.
Sector: Commercial Offices
Client: Heron International
Location: London
Project Partners: Skanska
Architect: KPF
Engineer: Arup
Steelwork Contractor: Severfield plc
Project Key Stats: 12,000 Tonnes
Completion Date: April 2010
More projects featuring Fabsec Cellular Steel Beams
  • Text Hover
20 FENCHURCH STREET LONDON
  • Text Hover
BIRMINGHAM HOSPITAL
  • Text Hover
NO 1 SPINNINGFIELDS MANCHESTER

SUBSCRIBE TO STAY UP TO DATE

The force behind Fabsec:
Follow us online

SUBSCRIBE TO STAY UP TO DATE

Fabsec are members of:
FABSEC LIMITED   Company registration number 04153086
FABSEC LIMITED
Company registration number 04153086