Heron Tower, London

Positioned at the heart of London, Heron Tower, also known as 110 Bishopgate, is the first 6* office building in The City.

The project consists of 47 storeys above ground level and 3 storeys below, providing a floor area of 63,000sqm. The building is topped by a 44m mast, making it the UK’s tallest building.

Severfield-Reeve Structures was awarded the contract and was responsible for the connection design, fabrication and erection of the 12,000 tonnes of structural steelwork required for this structure.

The 12,000 tonnes included 700 tonnes of Fabsec bespoke plated beams, of which more than 50% were coated with intumescent paint, providing fire protection of between 60 and 120 minutes.

Severfield-Reeve Structures was responsible for the supply and fix of the metal decking, edge protection and stairs for the project.

Sector

Commercial Offices

Client

Heron International

Location

London

Project Partners

Skanska

Architect

KPF

Engineer

ARUP

Steelwork Contractor

Severfield plc

Project Key Stats

12,000 Tonnes

Completion Date

2010