The software behind the cellular beam

The Smith, 7 Millbank

Project Description :

The Smith, within sight of the Palace of Westminster and Big Ben, a stone-clad building, built in two phases between 1915 and 1929, is being redeveloped to create an environmentally sustainable structure with modern, adaptable workspaces.

The nine-storey steel frame includes a ground floor with a 5.3m-high floor-to-ceiling soffit height (the upper office floors are 3.8m high) and terraces and a roof garden on the uppermost three levels, providing tenants with outdoor breakout spaces. Allowing plenty of natural daylight into the floorplates, the new building also features a centrally positioned full-height atrium that accommodates a feature steel staircase.

The heaviest steel element is a 13t box girder, positioned on level eight on the south elevation of the atrium. Acting as a transfer beam, it was designed so that it could be installed without splicing, while remaining within the limits of the tower crane capacity.

Sector

Commercial Offices

Location

London

Project Partners

Skanska

Architect

Make Architects

Engineer

Waterman Structures

Steelwork Contractor

William Hare

Project Key Stats

1,600 Tonnes

Completion Date

2026